PROJECT DESCRIPTION

The Township of Centre Wellington approved the design and construction of a 3,409 m3 elevated composite water storage reservoir to replace the existing water storage system and improve water services to the north end of the Town of Fergus.

Triton’s Services for this Project:

  • Design and construction of a new composite water tower, consisting of an elevated steel reservoir supported by a concrete shaft
  • All related process piping, circulation pump, chemical dosing system, site work, heating and ventilating, plumbing, instrumentation and electrical work
  • Watermain extensions, reconfiguration of the system operating strategy and decommissioning the existing obsolete infrastructure
  • Tendering of the project, resident supervision and contract administration of construction