Reconstruction of Metcalfe and Geddes

PROJECT DESCRIPTION

The reconstruction of Metcalfe and Geddes Streets included the replacement of all underground utilities (hydro, natural gas and telephone), asphalt and gutter, sidewalks, two sets of traffic signals, new trunk watermain and decorative street lights. The local businesses were included in the design process to ensure that access was maintained and that the disruption to all businesses was kept to minimum. Numerous public meetings were held and many suggestions were incorporated into the final design. The contract for this project was specifically scheduled to contain construction activities to designated blocks to keep the disruption to a minimum. The streetscaping for this project included planting beds in the boulevards, decorative brick sidewalks, decorative street lights and pedestrian sitting areas.

Triton’s Services for this project:

  • Coordination of utilities (hydro , natural gas & telephone)
  • Obtained Ministry of the Environment and Climate Change Certificate of Approval for the new trunk watermain and storm sewers
  • Obtain all approvals
  • Design of new road, parking areas, traffic signals including preparation of contract documents, specifications, tendering, contract administration and resident supervision
  • Capital Cost $2.0 million