PROJECT DESCRIPTION
As part of the County of Wellington project to construct a nursing home and health care facility, a storm water management strategy was required to mitigate impacts the development would have on the adjacent wetland and river.
Triton’s Services for this Project:
- Prepare a drainage scheme for the overall lands to satisfy existing development and long term goals.
- Design a stormwater management facility to provide control of peak flows and quality treatment of runoff.
- Liaison with approval agencies and interested parties ensuring that their needs are satisfied.